Skip to content
Muse SkillsIndependent
Submit a skill

Weekly Review

End-of-week review: open loops surfaced, next week's priorities drafted.

Tested in Museprompt packProductivityinstructionsreview-template

by Muse Skills editors · Written for this directory

View source

Ready to copy.

What it does

Weekly Review runs Friday afternoon. It reads your calendar, inbox, and goal file, then drafts the review in three parts: what got done, what’s still open (with the next action for each), and three proposed priorities for next week. You confirm the priorities. It never sets them for you.

What it includes

  • Done-this-week summary from calendar and sent mail
  • Open-loops list with next physical actions
  • Three proposed priorities for next week
  • Next-week calendar prep flags

Example

Output (abridged):

Done this week: shipped the pricing page, closed the Q3 invoice thread, dentist (finally).
Open loops: reply to Sam re: contract redlines → send the marked-up PDF; Q4 planning doc → add the hiring section.
Proposed priorities: 1) Send contract redlines 2) Finish Q4 planning doc 3) Clear the two open support escalations.
Needs prep: Tuesday's vendor call, read the SOW first.

What this one touches

Reads your calendar, inbox, and a goal file through the assistant's own connected accounts. Writes only the review back to you. Never sends mail, never creates calendar events, never edits your goal file.

Install

Copy this block and paste it into your Muse chat. Muse does the install and confirms when it's done.

Install prompt

Full source

This is the exact text Muse installs. Read it. That's the whole trust model.

SKILL.md
# Weekly Review

How to use: run this Friday afternoon, or on a schedule you set.
It reads your calendar, inbox, and goal file, then drafts the
review. You approve the priorities; it never sets them for you.

Trigger phrases: "run my weekly review", "draft my weekly review", "review my week".

## The prompt

You are running my weekly review. Read my calendar for the past 7
days, my inbox for flagged and unread messages, and my goal file.
Use only what these three sources contain. Do not invent a meeting,
an email, a goal, or completed work that is not in them.

Build the review in this exact order:

1. **Done this week.** The 3-5 most significant completed items,
   from calendar events and sent mail. One line each.
2. **Open loops.** Anything started but unfinished: unanswered
   threads, meetings with no follow-up, goals with no movement.
   One line each, with the next physical action.
3. **Proposed priorities for next week.** Three items, drawn from
   the open loops and the goal file. Mark them as proposed; the
   user confirms or edits them.
4. **Calendar check.** Anything next week that needs prep, flagged
   one line each.

Rules: do not mark anything done that is not evidenced in the
sources. Keep the whole review under one page. End by asking which
of the three proposed priorities to keep.
  • Packing List Builder

    Turns trip details, weather, and activities into a checked packing list grouped by bag, so nothing important stays home.

    skillinstructionsworkflowpacking-templatelast-check-list

    by Muse Skills editors · Written for this directory

    View
  • Daily Journaler

    Turns end-of-day notes into a structured journal entry in your notes system.

    skillinstructionsworkflowtemplate

    by Muse Skills editors · Written for this directory

    View
  • Research Brief Builder

    Gathers multi-source research into a structured brief with sources, key findings, and open questions.

    skillinstructionsworkflowbrief-template

    by Muse Skills editors · Written for this directory

    View
  • Report Watchdog

    Watches incoming reports against rules you set and flags anomalies while the day is still live.

    skillinstructionsworkflowrules

    by Muse Skills editors · Written for this directory

    View